LynxPower ROI Intelligence
What would energy intelligence need to save to pay for itself?
Build an indicative energy-savings business case in less than two minutes. Adjust the assumptions, see the break-even point and take the results to your finance team.
No promised savings. No signup required. Your figures never leave your browser.
A different approach to energy ROI
- 01Know the full cost
- 02Test realistic scenarios
- 03See your break-even point
- 04Verify performance after action
Your financial assessment
Site profile
Choose your sector and billing context.
Changing currency does not convert the amounts.
Average or normalized monthly amount.
Deployment & operating costs
Keep hardware, services and action investments separate.
Example: VFD, retrofits, automation or process modifications. Zero only when no extra investment is necessary.
0% is illustrative, not a financing offer.
Energy-saving scenario
These are assumptions to test — not LynxPower forecasts.
Only verified electricity savings should ultimately support the energy ROI.
Micro-NILM may optimize instrumentation CAPEX. PdM may reduce downtime risk. Neither is automatically added to electricity savings here.
Your business case
Updated instantly from your assumptions.
Electricity-bill savings required to cover monthly project costs
5.33%
CAPEX installment + monthly services, as a share of your bill.
- Your assumption
- 5%
- Break-even
- 5.33%
Your assumption is below the monthly break-even
- Estimated monthly energy savings
- €750
- Monthly installment + services
- €800
- Monthly cash flow after recurring costs
- -€50
- 5-year net value (nominal)
- -€3,000
5-year value bridge
Nominal, no escalation| Energy savings | +€45,000 |
|---|---|
| Total project costs | -€48,000 |
| Net value | -€3,000 |
Breakdown
- Monthly electricity bill
- €15,000
- Your assumed electricity-bill reduction
- 5%
- Annual gross electricity savings
- €9,000
- Total upfront project CAPEX
- €30,000
- Monthly financing installment
- €500
- Upfront cash investment
- €0
- Total financing interest
- €0
- Simple payback, before financing
- 66.7 months
- 5-year nominal ROI on total modeled costs
- -6.25%
This screening tool is not a quotation, guarantee or independently verified energy audit. Bill changes may reflect tariff or production changes. Actual savings require baseline, operating adjustments, execution and M&V.
The Tree of Opportunity
Where can energy improvements come from?
The three levels help prioritize actions. Selecting a level does not change the savings calculation: quantification must follow site assessment.
Sector-specific example · Industry & manufacturing
Machines running outside production hours
Detect non-essential idle operation and review shutdown schedules against production constraints.
From estimate to verified performance
The calculator starts the conversation. A real site assessment builds the evidence.
LynxPower's on-site approach connects trusted measurements, operational context, opportunity prioritization and IPMVP-aligned Measurement & Verification. Control and savings depend on site scope.